Garrett-Durchgangsdetektor in einer Logistikhalle, Handshake zwischen Sicherheitsteam und Werksleitung
For plant and loss prevention management

Prove the effect first.
Then invest.

1 to 2 months pilot. We measure your shrinkage before and after. A works council agreement template is included from day 1. After the pilot, you decide: fixed rental or purchase.

Before/after shrinkage measurement Works council agreement template included Fixed rental or purchase after proven effect
Invisible inventory drain

Internal shrinkage continues for years.

Three hurdles typically block any countermeasure: high upfront investment, possible works council objections, unproven effectiveness. Our pilot clears all three.

Status quo

Shrinkage continues because detectors are seen as too expensive and too complex.

What typically blocks plant managers:

  • ·High one-time investment per site before any effect is proven
  • ·Works council negotiations drag on without a template
  • ·Shrinkage reduction unknown in advance, no before/after benchmark
  • ·If the effect fails to materialize, the investment still sits on the balance sheet
Shrinkage stays
Investment first, effect only months later
SecureRent industry pilot

Pilot first. Investment decision with numbers on the table.

What you get in concrete terms:

  • Pilot over 1 to 2 months with before/after shrinkage measurement
  • Works council agreement template from day 1
  • Evaluation report after the pilot with your before/after shrinkage figures
  • After the pilot: fixed rental or purchase, you decide based on the numbers
1 to 2 months
Effect proven, then fixed rental or purchase
Typical areas of use

Industries with tangible internal shrinkage.

Five industrial sectors where high-value material flows pass through employee exits. This is where systematic exit screening has the most visible effect.

Recycling

Non-ferrous metals, precious metal fractions, scrap yards.

Pharmaceutical plants

API production and GxP areas.

Semiconductors

Wafer logistics and cleanroom access.

Distribution centers

DCs with peak-season spikes and seasonal staff.

Precious metal refineries

High-value material flows, controlled gates.

Conditions

You decide after the pilot.

We start small. You see the effect. Only then do you decide on the long-term configuration.

Pilot. 1 to 2 months

Impact pilot with measurement

Garrett PD 6500i at the employee exit. We measure your shrinkage 30 days before the pilot as a benchmark, run the setup for 1 to 2 months and evaluate the effect afterwards.


  • Shrinkage measurement 30 days before the pilot
  • Detector operation at the employee exit over 1 to 2 months
  • Evaluation report for management after the pilot
  • Works council agreement template from day 1
After the pilot. Fixed rental or purchase
600 EURper month (24 mo. fixed rental)

Garrett PD 6500i at the employee gate. Optionally VMI 6040C at goods receipt.


  • Fixed rental 24 months. Maintenance and insurance included
  • Purchase at the current device list price as an alternative
  • Service and maintenance still by DTI
  • Roll-out to further sites with the same configuration
The math

What a standard site actually saves.

Example calculation for a mid-size industrial or distribution site with a documented shrinkage rate.

The assumption

Mid-size distribution center.

The average inventory loss in German retail and logistics is around 0.72 percent of revenue (EHI Retail Institute). Around 25 percent of that comes from internal sources.

For a 50 million EUR site, that is 90,000 EUR of internal shrinkage per year. Even a 30 percent shrinkage reduction saves 27,000 EUR per year.

Arrange an initial consultation
Example calculation

Pilot + fixed rental, year 1

Internal shrinkage before90.000 EUR/year
Reduction 30 percent−27.000 EUR/year
Fixed rental PD 6500i (24 mo.)−7.200 EUR/year
Net savings year 1+19.800 EUR
Paybackunder 4 months

With two sites following the same pattern: approx. 40,000 EUR net savings per year.

30 to 40%
typical shrinkage reduction
1 to 2 months
pilot duration
under 6 months
ROI threshold

Indicative values from previous industry pilots. Specific figures are determined in your individual pilot and documented for your management.

Process

From initial consultation to fixed rental in 5 steps.

From the request through works council preparation and pilot to a proven decision.

1
Schritt 1

Request

Clarify site, material volume and shrinkage hypothesis in an initial consultation.

2
Schritt 2

Works council

Agreement template as the basis for the works council discussion.

3
Schritt 3

Pilot 1-2 months

Shrinkage measurement before the pilot, detector operation at the employee exit, measurement afterwards.

4
Schritt 4

Evaluation

Shrinkage reduction proven in EUR per month. Results report for management.

5
Schritt 5

Decision

Fixed rental or purchase. Roll-out to further sites optional.

Discuss a pilot

One site. One pilot.
Proven ROI.

We start at one site, measure rigorously and decide together. Fixed rental or purchase, roll-out or stop. You carry no long-term risk.

Mon to Fri, 8 am to 5 pm. We reply to requests within 24 hours.